This section provides installation information for the Agilent 5110 ICP Optical Emission
Spectrometers (ICP-OES), accessories and peripherals. This information is for the use of Field
Service Engineers (FSE’s) who have successfully completed an Agilent ICP-OES service training
course and are employed or otherwise authorized by the Agilent Sales and Service Organization.
The installation procedures check all the factory specified performance characteristics of the
Agilent 5110 ICP-OES in a progressive testing sequence.
These sequences must be followed to confirm that the instrument’s performance meets
specification. Only those parts which are not applicable to the type of system being installed
may be omitted.
The Agilent 5110 ICP-OES requires a minimum of two hours of purge time before running the
analytical test in this section.
For best results, the polychromator of the Agilent 5110 ICP-OES spectrometer should be
allowed to thermally stabilize at +35°C. This may take up to four hours.
If there are any faults during the installation and testing sequence, you must take corrective
action before repeating the steps or going on to the next step of the installation.
Before attempting installation, you must confirm that the site has been prepared in accordance
with the Agilent 5110 ICP-OES Pre- installation manual, Agilent publication number
G9010-90001.
Do not attempt instrument installation until the instrument has been unpacked and placed on its
intended workbench. This is your customer’s responsibility.
You must check the equipment for any sign of damage during transit and remove all packaging
material. Record any irregularities on the Installation Service Report and inform the customer of
any necessary actions. If required, postpone the installation until corrective action has been
taken.