Agilent 5110/5100 ICP-OES Service Manual Agilent Restricted 293
11 Preventative Maintenance
Inspect and clean the system
Inspect and clean the system
1 Clean or replace the pre-optics windows as required.
2 Remove right hand side and top cover as well as pre optics cover. Check the scanning mirror
shaft for free movement. Lubricate shaft with Fomblin grease if required.
3 Inspect the cables and connectors for wear and signs of overheating.
4 Clean air inlet filter on top of instrument.
5 Inspect the water cooling hoses from the water cooling system to the water cooling manifold
for cracks and leaks.
6 Turn-on the extraction system and using a soft tissue (or similar), ensure that the flow of the
extraction system is adequate.
7 Go to Instrument Status Page.
8 Check operation of water flow switch by turning-off the water cooling system and observing
that the Water cooling LED on the Status page goes red.
9 Turn-on the water cooling system.
10 Turn off the Argon supply and replace the Argon purge filter.
11 Remove the Gas control module and check the condition of the tubing for cracks and wear.
12 Replace the gas control module, turn on the Argon supply and set to 580kPa.

Table of Contents

Other manuals for Agilent Technologies 5110 ICP-OES

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies 5110 ICP-OES and is the answer not in the manual?

Agilent Technologies 5110 ICP-OES Specifications

General IconGeneral
BrandAgilent Technologies
Model5110 ICP-OES
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals