EasyManua.ls Logo

Agilent Technologies 5110 ICP-OES

Agilent Technologies 5110 ICP-OES
312 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
278 Agilent Restricted Agilent 5110/5100 ICP-OES Service Manual
10 Installation Guide (5110 ICP-OES)
Confirm system performance for 5110/5100
Confirm system performance for 5110/5100
Section Contents:
Start a plasma 278
Instrument Calibration 281
Wavelength calibration and Detector calibration 281
Instrument performance tests 283
Performance Test Procedure: 285
Analytical Tests 286
Start a plasma
From Shutdown mode (or for the first time)
1 Check that all tubing on the torch, spraychamber, nebulizer and peristaltic pump is correctly
connected.
2 Close the torch compartment door, ensuring that the locking lever is fully latched.
3 Switch on the computer, monitor and printer.
4 Turn on the argon gas supply.
5 If the nitrogen purge block is installed, turn on the nitrogen gas supply.
6 Switch on the water cooler.
7 Connect the Ethernet cable between the PC and instrument.
8 Plug the mains connector into the wall and switch on the instrument circuit breaker.
9 Set the instrument standby switch to on (Green LED should illuminate).
10 Observe the instrument start-up sequence:
The air cooling fan turns on.
The status indicator turns Blue then Yellow
11 Switch on the laboratory exhaust system.
12 Start the ICP Expert 7 software.
WARNING
The plasma emits heat, ozone and fumes, which can be hazardous. Always switch on the
exhaust system before lighting the plasma.

Table of Contents

Other manuals for Agilent Technologies 5110 ICP-OES

Related product manuals