7.
Dry the reservoirs using lint-free wipes.
1
DI H2O ≤40°C
8.
Fill and assemble the reserv
oirs.
a.
Fill the buer reservoir with 80 mL of 1X run buer.
a.
Fill the water and the waste reservoirs with 80 mL of deionized water.
b.
Assemble each reservoir assembly as shown below.
Buffer reservoir assembly
Water and waste reservoir
as
semblies
1. Add 80 mL 1X run buffer to the
Buffer reservoir.
2. Assemble the reservoir assembly
as shown below.
1
Retainer
2
Septum
3
Reservoir cap
4
Reservoir
5
Heated plate base
6
Power cable
1. Add 80 mL high-quality deionized
wat
er to each reservoir.
2. Assemble each reservoir
assembly as shown below.
1
Retainer
2
Septum
3
Reservoir cap
4
Reservoir
5
Plate base
Chapter 9 Maintenance
Perform a short-term shutdown
9
128
3730xl DNA Analyzer with 3730xl Data Collection Software 5 User Guide