Replacing the S8500C server
03-300529 Issue 4 January 2008 71
5. Select <OK> and press Enter to partition the hard drive and reformat the partitions.
The program begins the installation process and reports the progress.
These processes can take up to 20 minutes. When the server is ready to reboot, the
CD-ROM drive drawer opens. You can remove the CD from the drive at this time.
The reboot may take up to 3 minutes.
Installing service pack files on the S8500C server
Note:
Note: Skip this procedure if there is no Communication Manager software service pack
file to install.
This software service pack may or may not be call preserving.
Use the browser to load the necessary service packs.
1. Open a browser on your laptop.
2. In the Address field, type http://support.avaya.com and press Enter.
3. Select Downloads then choose S8500 server.