SENSseries LB 480 Level measurement
BERTHOLD TECHNOLOGIES GmbH & Co. KG
2 – 173
Volume 2 2 Installation
2
2.1 Transport to the Installation Site
Risk of injury!
– Never step under hovering loads while unloading heavy system
parts!
– Only use tested lifting equipment matching the transport
weights.
– Maintain adequate safety margin.
– Wear hard hat and safety shoes.
Transportation may also be carried out by construction site person-
nel with experience in transporting heavy components. However,
this construction site personnel has to be guided by authorized per-
sons; the Radiation Safety Officer has to be consulted for transpor-
tation of the source.
2.1.1 Transporting Detector and Evaluation Unit
Risk of damage!
System parts may get damaged during transport.
Transport the detector and evaluation unit in the original packaging
and protect the parts from vibrations.
2.1.2 Transporting Shielding with Source
Please observe the Radiation Protection Guidelines. Radioactive
substances may be transported on public traffic routes only by per-
sons in possession of the proper transport license!
Health hazards due to radiation!
A source may be transported only in its shielding. The shielding
must be closed during transportation and installation.
The shielding with the source inside can be lifted onto a palette by
a fork-lift and transported to its destination. If the system parts are
provided with eyebolts for transportation, they have to be used for
lifting, unless the system parts are transported in their original
packaging.