P1 Patient Monitor User’s Manual
20-2
the company.
20.2. Maintenance Schedule
The following tasks, except visual inspection, startup detection, touch screen
calibration and battery inspection, can only be completed by professional maintenance
personnel. Please contact the maintenance personnel in time when the following
maintenance is required. Before testing or maintenance, the equipment must be cleaned
and disinfected.
Check / Maintenance item Recommended frequency
Preventative Maintenance Tests
Visual inspection When first installed or reinstalled.
NIBP test Pressure check 1. If you suspects that the measurement is
incorrect.
2. Following any repairs or replacement of
relevant module.
3. At least once a year.
Leakage test
CO
2
test Leakage test
Performance test
Module Calibration
Performance Tests
ECG test Performance test
1. When you suspect that the measured value
is inaccurate.
2. After the relevant modules are repaired or
replaced.
3. At least once every two years. NIBP and
CO
2
modules shall be provided at least
once a year.
Module Calibration
RESP Performance test
SpO
2
test
NIBP test Pressure check
Leakage test
TEMP test
IBP test
Performance test
Pressure zero
CO
2
test Leakage test
Performance test
Module Calibration
Nurse call function test
When you suspect that the function is not normal.
Analog output performance test