P1 Patient Monitor User’s Manual
20-3
Defibrillation synchronization test
Electrical Safety Tests
Select test items based on IEC
60601-1.
1. After repairing or replacing the power
module.
2. Or after the monitor falls.
3. At least once every two years or as required.
Other Tests
Power-on test 1. First installation, or after each reinstallation.
2. After each repair or replacement of main
engine components.
Print test 1. During the first installation.
2. After repairing or replacing the printer.
Battery
check
Functionality test
1. During the first installation.
2. After replacing the battery
Performance test
Every two months or when the running time of
the battery is significantly shortened.
20.3. Checking the Version Information
You may be asked for version information of monitor and module during monitor
maintenance.
Select【Main Menu】quick keyfrom【System】column to select【Version】 to check
the system software version informatiom.
You can also view more version information by following this procedure:
1. Select 【 Main Menu 】 quick keyfrom 【 System 】 column to select
【Maintenance】input maintenance passwordEnter.
2. Select 【Module Version】. You can view module software and hardware
version, and firmware version.
20.4. Disposing of the Monitor
After the equipment reaches its service life, please dispose of the monitor and its
accessories according to local regulations.