P1 Patient Monitor User’s Manual
1-9
1.6. Applied Parts
The applied parts of the monitor are:
ECG electrode and leadwire
SpO
2
sensor
Temp probe
NIBP cuff
IBP transducer
CO
2
samping tube
1.7. Installation
1.7.1. Installing the P1 or plug-in module into the Docking Station
Install the P1, and a plug-in module if needed, to the Docking Station as indicated
below:
A click is heard when the P1 or plug-in module is pushed into place.
NOTE
:
To prevent the P1 or the plug-in module from falling out of the Docking
Station, after inserting the P1 or the plug-in module into the Docking Station,
always check that the P1 or the plug-in module properly engaged the Docking
Station.
When the plug-in module is properly installed, it should be further fasten to
the Docking Station with the lock at the bottom of the module to ensure the
engagement.