8.2 DSE 4 STEPS TO SUCCESSFUL SYNCHRONISING
NOTE: The DSE 4 Steps To Successful Synchronising must be performed on the load
sharing controllers. Steps 1, 2, 3 & 4 are to be performed on every DSE8x10 in the system,
whereas Steps 2, 3 & 4 are to be performed on every DSE8660 MKII controller.
Synchronising and load sharing is often considered to be a complex subject. In fact, it is very simple
when broken down into smaller steps.
After following the Commissioning section of this manual, the DSE 4 Steps must be followed before
any parallel operation is attempted.
The following information is a short form guide only, intended as a memory jogger once the steps are
fully understood.
The full video presentation of the 4 Steps is available on the DSE website. www.deepseaplc.com.
Registration on the website is required. This is free of charge, along with all other downloads.