EasyManua.ls Logo

DGSHAPE DWX-42W - Step 3: Spindle Run-In (Short)

DGSHAPE DWX-42W
169 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Starting Milling
29
2. Milling
Step 3: Spindle run-in (short)
Be sure to perform the following tasks before daily operations� These tasks are necessary for maintaining a favorable machine
condition and for ensuring a high level of product quality� If these tasks are not executed, a message prompting operation will be
displayed in VPanel�
Procedure
A
Show VPanel.
" P. 6 "Displaying VPanel"
B
Select the machine to operate.
C
Click .
MEMO
If the icon is displayed as , run-in (long) is necessary. Refer to P. 95 "Spindle Run-In (Long)" and perform the
run-in.

Table of Contents

Other manuals for DGSHAPE DWX-42W