EasyManua.ls Logo

DGSHAPE DWX-42W - Following Daily Operations; Collet Maintenance, Cleaning of Dummy Pin, and Checking of Coolant Flow Rate

DGSHAPE DWX-42W
169 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
44
2. Milling
Following Daily Operations
Collet Maintenance, Cleaning of Dummy Pin, and Checking of Coolant Flow Rate
Be sure to perform the following tasks after daily operations� These tasks are necessary for maintaining a favorable machine
condition and for ensuring a high level of product quality
If these tasks are not executed, a message prompting operation will be displayed in VPanel�
Required Tools
Included items
Commercially
available item
Collet replacement jig Collet tap Taper cleaner Collet brush Grease Clean, dry cloth
1.
Remove the collet.
A
Open the front cover.
B
Remove the workpiece, rotary axis correction jig, and magazine correction jig.
C
Close the front cover.
D
Show VPanel.
" P. 6 "Displaying VPanel"
E
Select the machine to operate.
F
Click .

Table of Contents

Other manuals for DGSHAPE DWX-42W