EasyManua.ls Logo

DGSHAPE DWX-52DCi - Spindle Run-In (Warm-Up)

DGSHAPE DWX-52DCi
112 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Part name Replacement time/Guideline
Collet
If the collet is deformed.
If an overload error or other error occurs, the collet may be deformed.
For information on how to perform replacement, refer to the replacement
instruction manual included with the part.
Spindle belt
If the spindle belt is worn.
For information on how to perform replacement, refer to the replacement
instruction manual included with the part.
Cleaning tool
If the brush bristles have spread out.
* The milling bur holder is not included with optional products.
" P.77 "Replacing the Cleaning Tool"
Spindle Run-in (Warm-up)
Spindle run-in (warm-up) may be required to stabilize the rotation of the spindle.
Situations Requiring This Work
When installing the machine
When replacing the spindle unit
When the machine has not been used for a prolonged period
Before use on days when the ambient temperature is low
Procedure
A
Close the front cover and turn on the power.
B
Show VPanel.
" P.7 "Displaying VPanel"
Periodic Maintenance
63
Chapter 3 Maintenance

Table of Contents

Related product manuals