6. ASSEMBLING THE HEAD SECTION
If the A1000 KIT has been supplied, the components must be installed on
the support profile. This operation is performed in the shop. The assembled
head section is then moved to the installation site.
For handling instructions see 17.
RISKS
PERSONAL PROTECTIVE EQUIPMENT
REQUIRED TOOLS
Ø 18 mm 6-8-10-13 5
!
A torque wrench must be used to achieve the specified fastening torques
(Nm).
For manual lifting, arrange for an adequate number of people for the
weight of the leaf: 1 person for every 20 kg to be lifted.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the FAAC A1000 and is the answer not in the manual?

FAAC A1000 Specifications

General IconGeneral
BrandFAAC
ModelA1000
CategoryDoor Opening System
LanguageEnglish

Related product manuals