EasyManua.ls Logo

Fluke Versiv Series - Page 237

Fluke Versiv Series
377 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Versiv Series Cabling Certification Product Family
Users Manual
228
1 Clean and inspect the connectors on the launch and tail cords
or patch cords and the link to be tested.
2 Connect the launch cord to the OTDR port and the link to be
tested, as shown in Figure 87. Connect a tail cord to the far
end of the link if necessary.
Or, you can use a patch cord that is 1 m long at minimum to
connect the tester to the link. To see results for the far-end
connector, connect a tail cord or patch cord (>1 m) to the far end
of the link.
3 On the home screen, tap the test setup panel.
4 On the CHANGE TEST screen, tap the button next to the
FaultMap test, then tap USE SELECTED. If a FaultMap test is not
available, tap NEW TEST to add one to the project.
5 Tap TEST or press .
www.GlobalTestSupply.com
Find Quality Products Online at: sales@GlobalTestSupply.com

Table of Contents

Other manuals for Fluke Versiv Series

Related product manuals