EasyManua.ls Logo

Huawei TaiShan 2280 V2 - Page 61

Huawei TaiShan 2280 V2
177 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step 12 Install the server. For details, see 4.4 Installing the Server on Guide Rails.
Step 13 Connect the power cables. For details, see 3.5 Connecting Cables to a PSU.
Step 14 Power on the server. For details, see 3.1 Powering On the Server.
Step 15 Log in to the iBMC WebUI, and check whether the new component is normal. For details, see
the TaiShan Rack Server iBMC User Guide.
----End
TaiShan 2280 V2 Server
User Guide
3 Basic Operations
Issue 01 (2019-07-01) Copyright © Huawei Technologies Co., Ltd. 53

Table of Contents

Related product manuals