EasyManua.ls Logo

Hypertherm XPR300 - System Electrical Requirements; Input Power Requirements

Hypertherm XPR300
162 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Plasma Power Supply
1
42 809970 Field Service Bulletin XPR300
Install the control transformer
1. Align the holes in the control transformer bracket with the sheet metal.
2. Use a 10 mm, hexagonal-socket wrench to install the nuts and screws. Tighten to 9.6 N∙m
(85 in∙lb).
3. Connect J1 to the power distribution PCB.
4. Connect L1 to the front fuse and L2 to the back fuse and tighten the screws. Tighten to
hand-tight.
5. Install the fuse covers.
6. Install the control-side panel.

Table of Contents

Other manuals for Hypertherm XPR300

Related product manuals