Hypertherm XPR300 Replacement Part Procedures

Hypertherm XPR300
162 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #81 background imageLoading...
Page #81 background image
Gas Connect Consoles
2
XPR300 Field Service Bulletin 809970 81
Install a proportional valve
1. On the new base make sure that the 2 small O-rings are in the new base.
2. Align the arrow on the top of the base with the arrow on the manifold.
3. Use the 2 screws to install the base. Tighten to 1.6 N∙m (14 in∙lb).
Make sure that the stem O-ring is against the brass piece. If not, you can
damage the O-ring.
4. Install the base cover.
5. Install the coil/solenoid.
6. Install the nut. Tighten to 3.3 N∙m (29 in∙lb).
7. Install the connector.
8. Install the screw.
9. Install the side panel.
10. Install the top panel
11 . Supply the gas and fluid pressure to the system.
12. Use the XPR web interface tool to do a leak test.
13. Use the XPR web interface to make sure that the pressures are in the acceptable ranges.
For more information on the XPR web interface, see the Connect for
Communication in the XPR300 Instruction Manual (809480).

Table of Contents

Other manuals for Hypertherm XPR300

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hypertherm XPR300 and is the answer not in the manual?

Hypertherm XPR300 Specifications

General IconGeneral
BrandHypertherm
ModelXPR300
CategoryWelding System
LanguageEnglish

Related product manuals