SRX1500 Services Gateway Cabinet Airflow Requirements
When you mount the SRX1500 Services Gateway in a cabinet, you must ensure that
ventilation through the cabinet is sufficient to prevent overheating. Consider the following
when planning for chassis cooling:
Ensure that the cool air supply you provide through the cabinet can adequately dissipate
the thermal output of the services gateway.
Install the services gateway as close as possible to the front of the cabinet so that the
cable management system clears the inside of the front door. Installing the chassis
close to the front of the cabinet maximizes the clearance in the rear of the cabinet for
critical airflow.
Route and dress all cables to minimize the blockage of airflow to and from the chassis.
Related
Documentation
SRX1500 Services Gateway Cabinet Size and Clearance Requirements on page 29
SRX1500 Services Gateway Clearance Requirements for Airflow and Hardware
Maintenance on page 26
SRX1500 Services Gateway Spacing of Mounting Brackets and Flange Holes on page 25