EasyManua.ls Logo

Juniper SRX1500 - Connecting the SRX1500 Services Gateway to a DC Power Supply

Juniper SRX1500
168 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 12
Installing the Rack Mounting Hardware
Preparing the SRX1500 Services Gateway for Rack-Mount Installation on page 49
Connecting the SRX1500 Services Gateway to the Building Structure on page 50
Preparing the SRX1500 Services Gateway for Rack-Mount Installation
You can mount an SRX1500 Services Gateway on four-post (telco) racks, enclosed
cabinets, and open-frame racks. Center-mount racks are not supported.
Before mounting the SRX1500 Services Gateway in a rack:
Verify that the site meets the requirements described in “Site Preparation Checklist
for the SRX1500 Services Gateway” on page 18.
Verify that you have the following parts available in your rack-mounting kit for the
SRX1500 Services Gateway:
Rack-mounting brackets
Screws
Verify that the racks or cabinets meet the specific requirements described in “SRX1500
Services Gateway Rack Requirements” on page 25.
Place the rack or cabinet in its permanent location, allowing adequate clearance for
airflow and maintenance, and secure it to the building structure. For more information,
see “SRX1500 Services Gateway Cabinet Airflow Requirements” on page 30.
Remove the gateway chassis from the shipping carton. For unpacking instructions, see
“Unpacking the SRX1500 Services Gateway” on page 45.
Related
Documentation
Connecting the SRX1500 Services Gateway to the Building Structure on page 50
Unpacking the SRX1500 Services Gateway on page 45
Verifying Parts Received with the SRX1500 Services Gateway on page 46
49Copyright © 2017, Juniper Networks, Inc.

Table of Contents

Other manuals for Juniper SRX1500

Related product manuals