2NC/2NF/2NG/2NN/3P7/3P8/3P9
1-2-2
1-2-2 Unpacking and installation
(1) Installation procedure
Unpacking
Install the platen cover (option)
Install the document processor (option)
Install the other optional devicees
Remove the tapes and spacer
Start
Load paper
Attaching the cover label
Make test copies
Connecting USB cable
Install the toner container
Installing toner
Cleaning the counter
(maintanance item U927)
Exit maintenance mode
Connect the power cord
Installing software
Output an own-status report
(maintenance item U000)
Completion of the machine installation
Install the paper feeder (option)