2NC/2NF/2NG/2NN/3P7/3P8/3P9
1-5-44
(1) Detaching and refitting the transfer roller
Procedure
1. Open the right cover.
Figure 1-5-74
2. Remove the cap and the front lever in
front of the transfer roller.
3. Remove the cap, the gear and the rear
lever in rear of the transfer roller.
4. Remove the transfer roller from the
bush by picking upward.
5. Check or replace the transfer roller and
refit all the removed parts.
Figure 1-5-75
Right cover
Cap
Front lever
Rear lever
Gear
Cap
Transfer roller
Bush
Bush