2NC/2NF/2NG/2NN/3P7/3P8/3P9
1-5-82
(13)Detaching and refitting the operation panel assembly
Procedure
1. Remove two screws.
2. Release four hooks and then remove
the connector from the operation panel
PWB.
3. Remove the operation panel assembly
upward.
4. Check or replace the operation panel
assembly and refit all the removed
parts.
Figure 1-5-145
Screw
Screw
Operation panel
assembly
Hook
Connector
Operation
panel PWB