2NC/2NF/2NG/2NN/3P7/3P8/3P9
2-2-32
4. Remove two screws.
5. Release four hooks and then remove
the connector from the operation panel
PWB.
6. Remove the operation panel assembly
upward.
Figure 2-2-36
7. Remove ten screws.
8. Release six hooks and then remove the
operation panel PWB.
9. Check or replace the operation panel
PWB and refit all the removed parts.
*: Be careful not to lose a spring.
Figure 2-2-37
Screw
Screw
Operation panel
assembly
Hook
Connector
Operation
panel PWB
Screws
Screws
Screws
Hooks
Operation
panel PWB
Spring