EasyManua.ls Logo

Kyocera DP-480

Kyocera DP-480
500 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2NC/2NF/2NG/2NN/3P7/3P8/3P9
1-2-23
15. Pass the heater wire through the aper-
ture of the frame.
16. Set the heater to the cut-and-raised
portion parts.
17. Bent two cut-and-raise portions and fix
the heater.
Figure 1-2-32
18. Pass the heater wire through two
aperture parts.
19. Connect the connector of the heater
wire to the connector on main unit.
20. Pass the heater wire through the wire
saddle and fix.
21. Refit all the removed parts.
Figure 1-2-33
Heater
Heater
Aperture
Heater wire
Cut-and-raised portions
Heater wire
Connector
Apertures
Connector
on main unit
Heater wire
Wire saddle

Table of Contents

Related product manuals