Install the top cover
Use this information to install the top cover.
About this task
Operating the server with the top cover removed might damage server components. For proper cooling and 
airflow, install the top cover before you turn on the server. 
Note: A new top cover comes without a service label attached. If you need a service label, order it together 
with the new top cover and attach the service label to the new top cover first. 
S033 
CAUTION: 
Hazardous energy present. Voltages with hazardous energy might cause heating when shorted with 
metal, which might result in spattered metal, burns, or both. 
S014 
CAUTION: 
Hazardous voltage, current, and energy levels might be present. Only a qualified service technician is 
authorized to remove the covers where the label is attached. 
A video for this task is available at:  
•  Youtube: 
https://www.youtube.com/playlist?list=PLYV5R7hVcs-DqVplE36HIvdM_sq_Auw3U
•  Youku: https://list.youku.com/albumlist/show/id_59643657.html
Attention: 
•  Read “Installation Guidelines” on page 185 to ensure that you work safely.
•  Prevent exposure to static electricity, which might lead to system halt and loss of data, by keeping static- 
sensitive components in their static-protective packages until installation, and handling these devices with 
an electrostatic-discharge wrist strap or other grounding system.
Procedure
Step 1.  Check your server and ensure that:  
•  All components are installed and seated correctly.
•  All internal cables are connected and routed correctly. See Chapter 3 “Internal cable routing” on 
page 71.
•  No tools or loose screws are left inside your server.
378 ThinkSystem SR650 V2Maintenance Manual