Crane operation
11.7 Heating and air-conditioning system
11 - 136 3 112 xxx en Operating Manual GMK6300L
xx.xx.xxxx
Preheating the
crane cab
If the crane cab is to be preheated in addition to the engine, adjust the
heating system as follows:
• Switch (1) to position Warm.
• Switch (3) to the Recirculated air symbol.
• Switch (2) to the required fan level.
• Open the air vents; à p. 11 - 132
H
The amount of time required to preheat the engine will be increased
significantly by simultaneously heating the crane cab.

Table of Contents

Other manuals for Manitowoc Grove GMK6300L-1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK6300L-1 and is the answer not in the manual?

Manitowoc Grove GMK6300L-1 Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK6300L-1
CategoryConstruction Equipment
LanguageEnglish

Related product manuals