Rigging work
12.1 Rigging work checklists for crane operation with the main boom
Operating Manual GMK6300L 3 112 xxx en 12 - 7
xx.xx.xxxx
6. Depending on transport:
– Attach the hook block to the bumper;
à p. 12 - 86 or
– Set down the hook block and unreeve the hoist rope;
à Setting down the hook block, p. 12 - 88,
à Unreeving hoist rope, p. 12 - 96.
7. For on-road driving without trailer:
– Turn the superstructure to the 180° position to the front with the RCL
adjusted accordingly,
– Place the main boom on the boom rest.
8. For on-road driving with a trailer:
– Set down the superstructure on a trailer with the RCL adjusted accord-
ingly and switch on the boom floating position;
à p. 6 - 13,
– Switch on the slewing gear freewheel;
à p. 6 - 12,
– If necessary, switch on the boom pre-tensioning;
à p. 6 - 14,
– Switching off the houselock;
à p. 11 - 15.
9. Switch off the engine for crane operation;
à p. 10 - 21.
10. Remove anemometer and the air traffic control light;
à p. 12 - 112.
s