Rigging work
12.1 Rigging work checklists for crane operation with the main boom
12 - 8 3 112 xxx en Operating Manual GMK6300L
xx.xx.xxxx
11. – Fold in the mirrors for crane operation; à p. 12 - 123,
– Lower the slewable spotlights;
à p. 11 - 108
12. Retracting the outriggers;
à CHECKLIST: Retracting the outriggers,
p. 12 - 29.
13. Activate the suspension (release locking).
The symbol (1) must be green (suspension on);
à p. 5 - 18.
14. Turn off the engine and, if necessary, remove the hand-held control and
stow it away in the driver's cab;
à Removing the hand-held control,
p. 12 - 21.
15. If there is no further work for the truck crane;
à In case of work breaks of
more than 8 hours
, p. 11 - 130.