EasyManua.ls Logo

Micromeritics TRISTAR II PLUS - Page 101

Micromeritics TRISTAR II PLUS
310 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
A. O-ring
B. Ferrule
C. Connector nut
D. Dewar cover
4. Place the connector nut, ferrule, and O-ring onto the sample tube stem.
5. Attach the sample tube to the analysis port and ensure it is completely in the port. Securely
screw the connector nut onto the analysis port. Hand tighten the connector nut.
6. Slide the Dewar cover upward until it stops.
Sample Tube O-ring Replacement
The equipment images in this topic may differ slightly from your equipment; however,
the instructions are the same unless otherwise noted.
It is important to maintain a vacuum-tight seal near the top of the sample tube stem. If an O-ring
becomes worn or cracked, it does not provide a good seal and will need to be replaced.
Before removing (or installing) a sample tube, ensure that the port valve is closed.
Observe the analyzer schematic to verify valve status.
Do not allow the sample tube connector nut drop onto the bottom of the tube as it may
break the tube.
Use the proper size frit for the sample port. The analyzer will not operate properly if an
incorrect size is used.
Sample Tube Installation
TriStar II Plus Operator Manual
303-42800-01 (Rev M ) Sep 2023
6 - 9

Table of Contents

Related product manuals