Outdoor installation Chapter 3
WinLink 1000 User Manual Release 1.9.40 3-7
2. Mounting the external antennas (if used), page page 3-8.
3. Mounting the Lightning Protection devices (if used), page page 3-9.
4. Outdoor connections, page page 3-9.
5. Mounting the IDUs, page page 3-10.
6. Indoor connections, page page 3-13.
7. Aligning the ODUs/antennas, page page 3-14.
See Figure 3-10 below, which illustrates a typical installation of a RADWIN 2000 or a Win-
Link 1000 with external antenna(s).
Figure 3-10: Typical Installation (with external antenna) Left: RADWIN 2000 Right: WinLink
1000
The installation steps are detailed in the following sections.
Outdoor installation
Preparing the ODU before Deployment
Each ODU must be pre-loaded with an IP address. This may be done prior to deployment in
the field, or on-site using a Laptop computer. The process is quite straight-forward and
described in Chapter 19.