1200-sheet LCT Installation (D631)
D129/D130 2-28 SM
6. Insert the joint pins [A].
7. Attach the front [B] and rear brackets [C]. (
x2 each)
8. Pull out the front and rear rails [A], and then hang them on each bracket [B].
9. Connect the LCT cable [C] to the main machine.
10. Slide the LCT [D] into the main machine.
11. Make sure that the front and rear sides of the LCT are closely attached to the main
machine.