G3 Interface Board Installation
D629 8 SM
1.2.3 INSTALLATION: TWO G3 BOARDS
1. Remove the SG3 board [A] from the second SG3 interface unit [B] for the two-SG3 board
installation (
x 2).
2. Attach the SG3 board [A] to the interface board [C] of the first SG3 interface unit (
x 2).
3. Remove the controller cover [A] (
x 2).
4. If the fax unit is already installed in the machine, remove the FCU (
x 4). If not, remove the
FCU cover (
x 3).
5. Attach one end (short length) of the flat cable to the connector [A] of the FCU board.
6. Attach the other end (long length) of the flat cable to the connector [B] of the CCUIF.