EasyManua.ls Logo

Ricoh D129 - Page 72

Ricoh D129
1402 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Bridge Unit Installation (D634)
D129/D130 2-40 SM
Holder bracket [E] is used in the installation procedure of the finisher (D588, D636
or D637). Do not install it at this time.
13. Pull out the extension tray [A] only if the 1000-sheet finisher (D588) will be installed on the
main machine.
14. Turn on the main power switch of the machine.
15. Check the bridge unit operation.

Table of Contents

Other manuals for Ricoh D129

Related product manuals