PR 5610 Installation Manual Commissioning
Sartorius 57
4 COMMISSIONING
Commissioning can be done via the front panel keypad or through a terminal emulation program running on a
PC or through a terminal (VT 100 compatible).
After switching on for the fist time, the following error message can appear:
The battery jumper has to be set (see chapter 0), this operation must be followed by a cold start (Cold) and clock
(date and time) adjustment.
4.1 Data saving / power failure
The configuration/ calibration data are stored in a non-volatile memory (EAROM). Data saving in EAROM is
done by command (configuration, calibration). A power failure is registered with a system event (+ PLC
address).
Write protection for the calibration data is provided (CAL-switch, see chapter 3.2)
4.1.1 Calibration data
Adjustment of: FSD values/ measuring time/ weighing parameters. The calibration parameters must be saved (by
command !). Moreover, the calibration parameters can be protected by CAL-switch. Before calibration, the unit
should be allowed to warm up.
1. At power-on, the calibration data are loaded from EAROM into RAM (working memory).
2. Function [Setup]-[Weighingpoints]-[WP X:Internal ADC]-[Calib]-[New]-[Reset all to default]-[YES]
loads the default calibration data from PROM into RAM.
3. During calibration the calibration data in RAM are modified.
4. Function [Exit calibration]-[Save] stores the modified calibration data from RAM into EAROM.