Commissioning
FLOWSIC600 · Technical Information · 8010125 V 4.0 · © SICK AG 165
Subject to change without notice
5.9 Sealing
After having completed the commissioning, seal the signal processing unit (if required) in
accordance with the sealing plan (
pg. 252, 9.9).
5.10 Documentation
The commissioning should be documented with a Commissioning Protocol. The document
"FLOWSIC600 Commissioning Protocol" is content of the FLOWSIC600 shipping on paper
and on the product CD.
File the completed Commissioning Protocol with the Manufacturer Data Record (MDR)