Chapter 9 Operating instructions
S300
102 © SICK AG • Industrial Safety Systems • Germany • All rights reserved 8010948/YY96/2016-02-17
Subject to change without notice
Commissioning
9.3 Re-commissioning
I
f the S300 has already been placed in operation once, however the device has been
temporarily replaced in the meantime, the S300 reads the configuration saved from the
system connector remaining on the machine or system. In this case acceptance by quali-
fied safety personnel is not necessary. However, the test in accordance with the regula-
tions for the daily test must be performed (see section 9.2.3 “Daily testing of the protective
device by a specialist or authorized personnel” on page 101).
The following indications are possible:
Step Display Meaning
1 , , ,,
, , ,
Power-up cycle, testing the 7<segment display. All
segments are activated sequentially.
2 Waiting for device on the EFI (only possible with S300
Advanced and Professional)
3
1
5)
or
Device addressed as host
Device addressed as guest
4 Waiting for valid inputs
5 No display
or
or
,
or
Device ready for operation
Device ready for operation but object in the protective
field
Device ready for operation but object in the warning field
Device ready for operation but object in the protective
field (in compatibility mode)
Other display Safety lock activated. Malfunction (see section 11.3 “Error
and status indications on the LEDs” on page 108).
Display Meaning
Power-up cycle, step 1
Power-up cycle, step 2
The device is operational, object in protective field
and warning field.
The device is operational, object in warning field.
The device is operational, no object in protective
field and warning field.
The device is operational, no object in protective
field and warning field. Reset required
Other display Safety lock activated. Malfunction (see
section 11.3 “Error and status indications on the
LEDs” on page 108)
15)
Only in an EFI system.
during and after the power
up sequence on re-commis-
sioning
the power up sequence