FS20 Marine Fire Detection Control Panel
44
Siemens Industry, Inc. A6V10519176_enUS_b
Building Technologies Division
9 BP-62 Batteries
The battery bracket is preinstalled in the unit prior to being deliveried.
9.1 Install Batteries – BP-62
NOTICE
Danger of short circuit
Potential damage to hardware
The supplied jumper wire must not be connected until the time of
commissioning.
Ensure the polarity of the supply is correct; red cable = positive pole, blue
cable = negative pole.
The batteries must meet the predefined specifications. For specifications, refer to the
section, ‘
Determine Battery’ on page 47.

Table of Contents

Other manuals for Siemens FC924

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens FC924 and is the answer not in the manual?

Siemens FC924 Specifications

General IconGeneral
BrandSiemens
ModelFC924
CategoryControl Panel
LanguageEnglish

Related product manuals