Planning the networking of the stations
Extended networking
8
118 | 242
Building Technologies
008843_v_en_
--
Fire Safety
2015
-
-
15
Degraded mode is guaranteed because the router stations monitor one another. If
the router station fails, the standby router station automatically takes over the
function of the router station.
Figure 51: Extended, redundant networking of SAFEDLINK sub-nets
1 FCnet/LAN
2
FCnet/SAFEDLINK sub-net with 512 FDnet line devices (not networked
redundantly)
3
FCnet/SAFEDLINK sub-net with >512 FDnet line devices or with a monitored
surface of >12,000 m
2
(networked redundantly)
4 FCnet/SAFEDLINK sub-net with external alarming or >512 FDnet line devices
5 Ethernet switch (modular) FN2012
6 Router station
7 Standby router station
8
Ethernet station (terminal or individual station) connected to the Ethernet
switch (modular) on the FCnet/LAN
9
SintesoWorks or SintesoView connected via the Ethernet switch (modular)
(high performance)
1
0
SintesoView or SintesoWorks connected via a station's Ethernet connection
(performance lower)