Determining the batteries and power supply
12
181 |
Building Technologies
Connection via I/O card (programmable) FCI2008
Figure 71: Simplified connection diagram for FBF and FSD via I/O card (programmable) in FC2080
FCC2002-A1 Processor unit (19", FC2080)
FCI2007-A1 I/O card (RT)
FCI2008-A1 I/O card (programmable)
SDA Key safe adapter SDA3000 [DE]
FBF Fire brigade operating panel [DE]
FAT Fire brigade indication panel [DE]
ÜE/FSE Release element zone/release element [DE]
FSD Fire brigade key depot [DE]
The supply for the SDA and FSD components and the I/O
always be connected to the same I/O card (programmable).
You will find detailed information on the key safe adapter in the manufacturer's
document 'SDA3000 installation instructions', which comes with the key safe
adapter.
You will find detailed information on wiring the SDA in the installation document
008851.
12.7 Determining the batteries and power supply
The selection of batteries and power supply corresponds in general to that of the
compact stations. The supply concept however differs from that of compact
stations.
See also
2 Determining the batteries and power supply [➙ 150]
FSD
RS485
FCC2002-A1
Sabotage
RT fire active/confirmed
Heating active
RT fire active
FC2080
FCI2008-A1
SDA
Vsys_01
Vsys_02
Sabotage
Unlocking
Door contact
FBF
FAT
FCI2007-A1
ÜE/
FSE