EasyManua.ls Logo

Siemens FS20 - Determining the Batteries and Power Supply

Siemens FS20
242 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Assembling the FC2080
Determining the batteries and power supply
12
181 |
242
Building Technologies
008843_v_en_
--
Fire Safety
2015
-
-
15
Connection via I/O card (programmable) FCI2008
Figure 71: Simplified connection diagram for FBF and FSD via I/O card (programmable) in FC2080
FCC2002-A1 Processor unit (19", FC2080)
FCI2007-A1 I/O card (RT)
FCI2008-A1 I/O card (programmable)
SDA Key safe adapter SDA3000 [DE]
FBF Fire brigade operating panel [DE]
FAT Fire brigade indication panel [DE]
ÜE/FSE Release element zone/release element [DE]
FSD Fire brigade key depot [DE]
The supply for the SDA and FSD components and the I/O
connections must
always be connected to the same I/O card (programmable).
You will find detailed information on the key safe adapter in the manufacturer's
document 'SDA3000 installation instructions', which comes with the key safe
adapter.
You will find detailed information on wiring the SDA in the installation document
008851.
12.7 Determining the batteries and power supply
The selection of batteries and power supply corresponds in general to that of the
compact stations. The supply concept however differs from that of compact
stations.
See also
2 Determining the batteries and power supply [ 150]
FSD
RS485
FCC2002-A1
Sabotage
RT fire active/confirmed
Heating active
RT fire active
FC2080
FCI2008-A1
SDA
Vsys_01
Vsys_02
Sabotage
Unlocking
Door contact
FBF
FAT
FCI2007-A1
ÜE/
FSE

Table of Contents

Other manuals for Siemens FS20