Determining the compact stations
Defining the hardware for the stations
11
161 |
Building Technologies
11.4.1.1 Defining the operating units
From MP5, only operating units which are equipped with the PMI & mainboard
FCM2027 are used.
All ↑ stations with index ES 20 or higher come with the PMI & mainboard
FCM2027 included.
Stations with indexes lower than ES 20 come with the PMI & mainboard
FCM2004 included.
Operating units with the PMI & mainboard FCM2027 are available separately for
converting existing stations. The PMI & mainboard FCM2027 only supports
stations with firmware > MP-EN3.0
You will find detailed information about this in document 008837.
Use the table below to determine the operating unit.
Design Options of the operating unit
Operating unit (Standard)
● FCM2028-A2
● Key switch (Kaba) FTO2005-C1
● Key switch (nordic) FTO2006-B1
● Event printer FTO2001-A1
Operating unit with key switch (Nordic)
[FI], [SE]
● FCM2028-B2
● Event printer FTO2001-A1
Operating unit France [FR]
● FCM2028-F2
● Event printer FTO2001-A1
● Key switch (Kaba) FTO2005-C1
● Key switch (nordic) FTO2006-B1
Operating unit with LED indicator
(internal)
● FCM2029-A2 (with LED r, y)
● FCM2037-A2 (with LED r/y, y)
● Key switch (Kaba) FTO2005-C1
● Key switch (nordic) FTO2006-B1
Operating unit with FBA terminal
[CH]
● FCM2030-C2
Operating unit with EVAC-NL operation
[NL] and key switch (nordic) [NL]
● FCM2030-N2
Table 44: Operating unit and options