www.stryker.com 280C-009-002 REV B 1-49
Return To Table of Contents
English
POWER CORD CONNECTOR REPLACEMENT
Tools Required:
• #1 Phillips Screwdriver
• #2 Phillips Screwdriver
Procedure:
Note
Unless otherwise indicated, refer to Figure 12, page 1-48,for reference for this procedure.
1. Raise the bed to the highest position and apply the brakes.
2. Unplug the bed power cord from the wall outlet.
3. Remove the power cord from the power connector and disengage it from the wire clip.
4. Properly ground yourself (see “Grounding Diagram” page 1-13).
5. Using a #2 Phillips screwdriver, remove the six screws (A) holding the cover to the litter. Keep the cable clips.
6. Once the screws are removed, pivot the cover and lay it flat on the bottom of the litter (see opposite illustration).
7. Remove all cables connected to the power cord connector. Note the location of the cables in order to properly
reconnect them later. Refer to drawing OL280120, page 1-88, or OL280121, page 1-94, for the connecting position
of the cables on the power connector.
8. Turn the cover to a vertical position. Using a #1 Phillips screwdriver, remove the two screws (D) holding the power
connector to the cover.
9. Unplug the connector and remove it.
Note
Ensure the proper size fuses are used in the new power cord connector before installing it.
10. Reverse the above steps to install the new power cord connector.
11. Test all the bed functions before returning the bed to service.
Service Information