EasyManua.ls Logo

Stryker GoBed II - Page 60

Stryker GoBed II
338 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1-58 280C-009-002 REV B www.stryker.com
Return To Table of Contents
English
AUTO CONTOUR MICRO SWITCH REPLACEMENT (CONTINUED)
2ND AUTO CONTOUR MICRO SWITCH
This switch tells the control board to start lowering the Gatch when the Fowler is lowered while the bed is in the Auto
Contour position.
1. Unplug the bed power cord from the wall receptacle.
2. Using a #1 Phillips screwdriver, remove the two screws (D) holding the support to the litter and remove the support.
3. Remove the cables from the switch. Note the cable locations in order to properly reconnect them to the new
switch.
4. Using a #1 Phillips screwdriver, remove the two screws (E) holding the switch to the support.
5. Reverse the above steps to install the new micro switch.
6. Test the Auto Contour positioning for proper operation before returning the bed to service.
Service Information

Table of Contents

Related product manuals