OPERATION & MAINTENANCE MANUAL SWE50E/SWE60E/SWE70E/SWE80E9/SWE100
3.10.4 New machine running-in
Note
All machines have a running-in period.
The running-in period of our machines
is the first 50 hours.
How well does the machine run during
running-in period have direct effect
on the machine performance in the
future in terms of use effect and
service life. Please follow the rules
specified in this manual.
After starting the engine, do not attempt any
operation; allow it to idle for 15 seconds.
After idle running, attempt all digging, swing
action without load at idle speed for 5 minutes.
Do not operate with heavy load or at high
speed.
Before stopping the engine, do keep it running
at idle for longer than 2 minutes.
Do not start, accelerate, steer, travel and
attempt all other actions sharply, except in
emergency.
Every 8 hours or every day
Every 8 hours maintenance or every day
maintenance( refers to maintenance guide 8
hours) At the initial 100 hours or work in the
mud or water, every 8 hours lubricate pin of
work attachment.
After initial 50 hours
Every 50 hours maintenance ( refers to
maintenance guide 50 hours), Replace engine
oil at the first 50 hours。Check fastener torque.
( refers to fastener torque specification of
maintenance)
After initial 100 hours
Every 100 hours maintenance( refers to
maintenance guide 50 hours and 100 hours)