EasyManua.ls Logo

SUNWARD SWE50E - Machine Maintenance Schedule; Daily Maintenance (Every 8 Hours)

SUNWARD SWE50E
240 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATION & MAINTENANCE MANUAL SWE50E/SWE60E/SWE70E/SWE80E9/SWE100
143
4.5 Machine maintenance schedule
4.5.1 Daily maintenance (every 8 hours)
Carry out the following maintenance
operation before starting machine daily(8
hours)
4.5.1.1 Filling grease of work attchment
(1) boom cylinder foot ,1 place.
SWE80 boom cylinder foot ,2 places
(2)boom foot pin ( 2 places)
(3)arm cylinder foot pin (1 place)
(4)boom cylinder piston rod end (1 place)
(5)boom – arm connecting pin ( 1 place)
(6)arm cylinder piston rod end (1 place)
(7)bucket cylinder foot pin (1 place)
(8)arm –link connecting pin( 1 place)
(9)arm – bucket connecting pin( 1 place)
(10)link connecting pin( 1 place)
(11)bucket cylinder rod end.(1 place)
(12)bucket – link connecting pin( 1 place)

Table of Contents