EasyManua.ls Logo

SUNWARD SWE50E - Every 500 Hours Service

SUNWARD SWE50E
240 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATION & MAINTENANCE MANUAL SWE50E/SWE60E/SWE70E/SWE80E9/SWE100
166
4.5.7 Every 500 hours service
Carry out EVERY 50 HOURS SERVICE
and EVERY 100 HOURS SERVICE at the
same time.
4.5.7.1 Greasing ball track of swing
bearing
Stop the machine at level ground, lower
the bucket at level ground.
Shut auto-idle speed switch, run the
engine unloaded at low speed for 5
minutes.
Important
Stopping the engine improperly may
damage turbocharger.
Set start key to OFF position, stop the engine,
remove the key from starting lock, set safety
lock lever to LOCK position.
Pump in grease through 3 grease fittings to
swing bearing ball track.
Start engine, lift bucket, and swing
upper-structure at 45 degree.
Repeat 3 times from step 3 until lubricating
grease overflows from swing bearing seal.

Table of Contents

Related product manuals