EasyManua.ls Logo

TOHATSU BFT75A - Page 548

TOHATSU BFT75A
609 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
19-11
dummyheaddummyhead
CONTROLS
INSTALLATION
Set the neutral switch [1] on the neutral switch bracket
[2] and tighten the nut [3] to the specified torque.
Set clip A [4] on the neutral switch wire and install clip A
on the neutral switch bracket.
Install the neutral switch bracket [1], aligning the two
holes [2] in the neutral switch bracket with the two
projections [3] on the crankcase as shown.
Tighten the bolt [4] securely.
Install the harness band clip [5] that clamps the fuse
cable on the neutral switch bracket.
Connect the neutral switch 2P connector [6] and install
the connector on the neutral switch bracket.
Apply marine grease the following part.
Shift shaft spline portion
Detent spring roller/link pin contact portion
Install the shift arm [1] on the shift shaft, aligning the
projection on the shift arm [2] with the recess in the shift
shaft [3] as shown.
Set the snap pin [4] on the shift shaft securely as
shown.
TORQUE: 2.5 N·m (0.26 kgf·m, 1.8 lbf·ft)
[2]
[3]
[4]
[1]
[6]
[5]
[1]
[4]
[3]
[2]
[3]
[4]
[2]
[3]
[1]

Table of Contents

Related product manuals