EasyManua.ls Logo

TOHATSU BFT75A - Installation; Seal Holder Removal

TOHATSU BFT75A
609 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
19-12
dummyheaddummyhead
CONTROLS
Apply marine grease to the following part.
Circumference of the link pin of the shift link bracket
Throttle plate (linkage pivot installation part)
linkage pivot (throttle rod)
Install the shift link bracket [1], aligning the link pin [2]
with the long hole in the shift arm [3] and secure the
shift link bracket by tightening the two bolts [4].
Install the linkage pivot [5] on the throttle plate.
Check that the tip of the neutral switch [1] is pushed in
the detent assisted spring [2] securely.
Check that the detent spring roller [3] is in the groove in
the shift arm [4] securely.
Tighten the loosely tightened bolt [5] securely.
Install the starter cable holder [1] on the shift link
bracket using the two bolts [2].
Install the following parts:
Stater cable/fuse cable (page 10-8)
Remote control cable/grommet (page 19-5)
R. engine under cover (page 6-7)
Front separate cover (page 6-4)
Engine cover
SEAL HOLDER REMOVAL/
INSTALLATION
Remove the shift link bracket (page 19-8).
Remove the two bolts [1] from the seal holder [2].
Remove the seal holder, being careful not to allow
the shift shaft to come out of position in the mount
case.
Remove the seal holder while pushing the shift shaft
toward the mount case side.
If required, replace the seal (page 19-14).
Remove the O-ring [3] from the seal holder.
Apply marine grease to a new O-ring and install it to the
seal holder groove.
Insert the seal holder into the shift shaft slowly, and
tighten the two bolts securely.
Install the shift link bracket (page 19-11).
[1][4]
[5]
[2]
[3]
[4]
[3]
[1]
[2]
[5]
[1]
[2]
[2]
[1]
[3]

Table of Contents

Related product manuals