EasyManua.ls Logo

TOHATSU BFT75A - Combination Switch Inspection

TOHATSU BFT75A
609 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
19-45
dummyheaddummyhead
CONTROLS
Clean the housing and under cover mating surfaces
thoroughly using a shop towel and degreasing cleaning
solvent.
Apply liquid gasket (ThreeBond® #1216E or equivalent)
to the housing in the areas shown.
Install the under cover [1] and six screws [2] and tighten
them to the specified torque.
Install the tiller handle (page 19-22).
COMBINATION SWITCH INSPECTION
Check for continuity between the terminals with the
switch in each position.
9 mm
(0.4 in)
20 mm
(0.8 in)
TORQUE: 2.4 N·m (0.24 kgf·m, 1.8 lbf·ft)
[2]
[1]
Black/Red
Black
Black/
Yellow
White/
Black
Black/
White
OFF
E
Black
IG
Black/
Red
BAT
White/
Black
LOAD
Black/
Yellow
ST
Black/
White
START
ON
Color
Position
: Continuity

Table of Contents