EasyManua.ls Logo

Vertical Express ICON 32 - User Manual

Vertical Express ICON 32
220 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Controller

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Vertical Express ICON 32 and is the answer not in the manual?

Summary

Preliminary Installation

Prepare for Temporary Operation

Steps to prepare the system for temporary operation before final installation.

Temporary Operation

Runbug Set Up

Procedure for setting up the runbug for temporary operation.

I-2;I-3 Valve

Relief Pressure Verification

Procedure to verify the pressure relief setting of the valve.

Low Pressure Adjustment

Procedure for adjusting the low pressure setting on the valve.

Selector Tape

Mount the Tape

Steps for mounting the selector tape to the hoistway components.

Preliminary Adjustment

Safety Processor Verification

I;O and Safety String Checkout

Troubleshooting Guide

Safety Processor (SP) bad LED

Steps to troubleshoot when the Safety Processor LED indicates a fault.

Controller User Interface Tool (UIT)

CAN Node Configuration via the Startup Wizard

CPU Replacement

Back Up the Job Software

Steps to back up the current job software before replacement.

I-2;I-3 Valve Reference

Valve Final Adjustments

Step-by-step guide for performing final valve adjustments.

Vertical Express ICON 32 Specifications

General IconGeneral
BrandVertical Express
ModelICON 32
CategoryController
LanguageEnglish